STS Scope
Construction of the seawater intake siphon for the cooling system of Unit 5 at the Guacolda Thermoelectric Power Plant. The project included bathymetric surveys, massive underwater concrete work (2,200 m³ of H45 class concrete, with compressive strengths up to 1,000 kgf/cm²), foundation concrete, and the maritime operation of launching, floating, transporting, and assembling a 100-ton jacket structure, including drilling and anchor installation through its piles. 1,870 hours of Industrial Commercial Diving (CTP) were performed under ADCI standards, without accidents.