STS Scope
Construction of the marine intake and discharge works for the Minera Los Pelambres desalination plant. The intake line includes passive filters, a 1,800 mm HDPE pipe laid in a trench on the seabed (approx. 492 m), and a 1,800 mm internal diameter, 341 m long concrete-lined tunnel with internal backwash and hypochlorite piping. The brine discharge line consists of a 1,200 mm HDPE pipe on the seabed (approx. 625 m) and a 530 m long concrete tunnel.