STS Scope
Construction of the underwater intake and discharge works for the EWS seawater desalination plant. The scope included two 2,000 mm diameter underwater intake tunnels (530 m each), a 2,000 mm diameter discharge outfall pipe, the recovery of the tunnel boring machines (TBMs) from a sea shaft at -40 m, underwater concreting of foundations, and the underwater assembly of 400-ton intake structures and the discharge pipes with their diffusers. STS had previously carried out the marine geotechnical studies and tunnel engineering, with over 220,000 man-hours completed without accidents.